2004 Land Rover Range Rover Hse Sport Utility 4-door 4.4l on 2040-cars
Flat Rock, North Carolina, United States
Body Type:Sport Utility
Engine:4.4L 4398CC V8 GAS DOHC Naturally Aspirated
Vehicle Title:Clear
Fuel Type:GAS
For Sale By:Private Seller
Number of Cylinders: 8
Make: Land Rover
Model: Range Rover
Trim: HSE Sport Utility 4-Door
Warranty: Unspecified
Drive Type: 4WD
Options: Sunroof, Cassette Player, 4-Wheel Drive, Leather Seats, CD Player
Mileage: 80,061
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Sub Model: HSE
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Exterior Color: Black
Interior Color: Brown
Land Rover Range Rover for Sale
- Range rover sport hse sport utility fsbo
- Hse sport loaded(US $29,900.00)
- 2011 land rover range rover hse 4x4 sunroof nav 27k mi texas direct auto(US $59,780.00)
- Low mileage factory warr.luxury pkg hk vision assist navigation leather awd 4x4(US $54,898.00)
- 2011 land rover range rover 4wd 4dr sc autobiography
- Amazing 510 horsepower 2010 range rover supercharged - we finance!
Auto Services in North Carolina
Wheelings Tire ★★★★★
Wasp Automotive ★★★★★
Viewmont Auto Sales 2 Inc ★★★★★
Tire Kingdom ★★★★★
Thomas Auto World ★★★★★
The Speed Shop ★★★★★
Auto blog
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.
Jaguar Land Rover and Chery investing in Chinese plant
Sat, 24 Nov 2012While the European auto market for Jaguar and Land Rover is waning, Chinese car buyers can't get enough of the British marques. To meet that demand, Tata Motors, parent company of Jag and Land Rover, is partnering with Chinese automaker Chery Automobile Co.
The two announced plans to invest $1.75 billion to build a new plant and create a new, China-focused brand. 2014 is the target for completion of the factory. Jaguars and Land Rovers built at the facility will be the first ever produced outside the UK according to the Associated Press. The JV will be called Chery Jaguar Land Rover Automotive Company Ltd.
The announcement comes less than a month after JLR announced it would open a design studio in China. It's not clear from the reports whether the two announcements are part of the same JV or two separate plans.
Jaguar Land Rover says key models in short supply, some have six-month wait lists
Fri, 08 Aug 2014Care for a bit more proof that the Jaguar Land Rover portfolio of vehicles is the best it's ever been? Well, the Indian-owned pair of brands saw a record year in 2013, while 2014 has seen a 14-percent increase in sales. The crazy thing is, though, is that figure could be even higher, provided the company had the production capacity.
JLR is running a six-month waiting list on two of its most popular models, the Range Rover Sport (above) and Range Rover. According to Mark White, the company's chief technologist for body engineering, the blame can be placed on the paint shop at the company's Solihull factory, in the UK.
"We will probably max out the paint shop before we max out the body shop. Putting the second body shop in has given us the flexibility to ebb and flow the different models that go through there and meet the capacity demands we've got," White told Automotive News. "However, you always hit a bottleneck somewhere. And the paint shop is probably going to be the next biggest obstacle."