Base 4x4 4dr Suv Abs - 4-wheel Air Suspension Antenna Type - Diversity on 2040-cars
Columbus, Ohio, United States
Body Type:SUV
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Used
Year: 2010
Make: Land Rover
Model: LR4
Warranty: Unspecified
Mileage: 64,756
Sub Model: Base 4X4 4dr
Exterior Color: Tan
Interior Color: Other
Land Rover LR4 for Sale
- 2012 land rover lr4 hse 38k miles*rear dvd*navigation*reverse camera*we finance!(US $46,973.00)
- Hse suv 5.0l cd 9 speakers am/fm radio mp3 decoder premium audio system compass
- 2012 land rover lr4 luxury hse awd(US $50,800.00)
- 2014 land rover lr4 hse lux package / black design package / huge msrp 7k miles(US $79,999.00)
- 11 lr4 hse lux 4wd 40k 1 owner hk nav pdc cam keyless pano 3rd row(US $41,995.00)
- 4wd 4dr hse low miles suv automatic gasoline 5.0l 8 cyl firenze red metallic(US $47,500.00)
Auto Services in Ohio
Williams Auto Parts Inc ★★★★★
Wagner Subaru ★★★★★
USA Tire & Auto Service Center ★★★★★
Toyota-Metro Toyota ★★★★★
Top Value Car & Truck Service ★★★★★
Tire Discounters Inc ★★★★★
Auto blog
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.
Jaguar and Land Rover to consolidate dealerships
Thu, 29 Nov 2012Jaguar and Land Rover are set to merge their sales facilities, according to Inside Line. Jaguar Land Rover North America President Andy Gross says 45 percent of Jaguar owners also have an SUV in their stable, so it makes sense to give customers as much exposure to the cat's high-riding cousins and possible. The number of overall outlets will remain the same, and the brands will reportedly remain separate on the showroom floor, however.
So far, just one dealer has made the move to combine under the roof of one 68,000 square-foot facility in Paramus, New Jersey (above), though a further 20 are ready to make the shift and become Jaguar Land Rover outlets. Gross believes the shift is necessary so that his company's dealer network will accurately reflect the company's products. We'll see how cozy the brands are when Jaguar starts rolling out its own SUVs in a few years.
Jaguar Land Rover says key models in short supply, some have six-month wait lists
Fri, 08 Aug 2014Care for a bit more proof that the Jaguar Land Rover portfolio of vehicles is the best it's ever been? Well, the Indian-owned pair of brands saw a record year in 2013, while 2014 has seen a 14-percent increase in sales. The crazy thing is, though, is that figure could be even higher, provided the company had the production capacity.
JLR is running a six-month waiting list on two of its most popular models, the Range Rover Sport (above) and Range Rover. According to Mark White, the company's chief technologist for body engineering, the blame can be placed on the paint shop at the company's Solihull factory, in the UK.
"We will probably max out the paint shop before we max out the body shop. Putting the second body shop in has given us the flexibility to ebb and flow the different models that go through there and meet the capacity demands we've got," White told Automotive News. "However, you always hit a bottleneck somewhere. And the paint shop is probably going to be the next biggest obstacle."
2040Cars.com © 2012-2024. All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.
Use of this Web site constitutes acceptance of the 2040Cars User Agreement and Privacy Policy.
0.032 s, 7228 u