2.4l I4 Cvt Automatic Power Equipment Cruise Steel Wheels Cd Mp3 Keyless Entry on 2040-cars
New Braunfels, Texas, United States
Jeep Patriot for Sale
- Fwd 4dr sport new suv automatic gasoline 2.4l i4 sfi dohc 16v black clear coat
- 2011 jeep patroit 4x4 2.4l automatic(US $14,995.00)
- Limited suv 2.4l cd 4x4 power steering abs 4-wheel disc brakes brake assist a/c(US $20,900.00)
- Sport suv 2.4l cd front wheel drive power steering abs steel wheels fog lamps(US $16,500.00)
- 2009 jeep patriot sport utility 4-door 2.4l(US $10,900.00)
- 2008 jeep patriot sport 4x4(US $6,500.00)
Auto Services in Texas
Yale Auto ★★★★★
World Car Mazda Service ★★★★★
Wilson`s Automotive ★★★★★
Whitakers Auto Body & Paint ★★★★★
Wetzel`s Automotive ★★★★★
Wetmore Master Lube Exp Inc ★★★★★
Auto blog
Chrysler recalling 630k Jeep models worldwide
Thu, 06 Jun 2013Despite its refusal to recall 2.7 million Jeep Grand Cherokee and Liberty models this week over a gas tank fire risk, Chrysler will be recalling 630,000 Jeep Compass (pictured), Patriot and Wrangler vehicles around the globe for a pair of entirely different reasons.
The affected Compass and Patriot models are all from the 2010 to 2012 model years - 254,000 in the United States, 45,400 in Canada and 109,000 elsewhere in the world. In these models, a software error may result in the late deployment of the side airbags and seatbelt tensioners. In the event of a crash, failure of these systems could result in more serious injuries for the vehicle's occupants.
Jeep's go-anywhere Wrangler also faces a separate recall due to power steering fluid lines that can possibly wear a hole in the transmission oil cooler line. According to Chrysler, the vehicles could then leak fluid, possibly damaging the transmissions. Roughly 221,100 Wrangler models are being recalled because of this issue, all of which are fitted with Jeep's 3.6-liter Pentastar V6 engine. In the US, 181,000 vehicles are affected, with an additional 18,400 in Canada and 21,700 additional units worldwide. A Chrysler spokesperson said that no crashes or injuries have been reported with either case, according to the Associated Press.
Chrysler adding 200 jobs at Ohio Jeep Wrangler plant
Fri, 15 Mar 2013Chrysler is betting that the Jeep Wrangler will continue its strong sales surge as it continues to push the legendary brand out across the globe. The Auburn Hills automaker is reportedly adding 200 workers at the Toledo, Ohio plant that builds the Wrangler. What's more, those new hires will be at their posts quickly - they'll be on the job by April 1. Of those 200 workers, 130 employees will be there to relieve those who need breaks.
Why do they need so many relief workers? The Toledo Jeep Complex is currently working at a torrid pace with two ten-hour shifts. A third shift has been ruled out for the moment because of a production botttleneck - the plant's paint shop is already maxed out. According to Reuters, Wrangler production in 2012 cleared 200,000 units, and US sales were up by 16 percent.
Another part of the Toledo plant is presently down as Chrysler retools the line to build Jeep's divisively styled Liberty replacement, the Cherokee (seen in our gallery below). Production for the new model is scheduled to begin toward the end of May.
Chrysler investing $20M in Toledo plant to support 9-speed auto production
Sun, 28 Apr 2013In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.